On a level lot with no major complicating factors, here's how excavation and foundation work for a new garage:
Step 1 — Topsoil removal. The ground you walk on is full of organic matter that's constantly decomposing. Build a foundation on it and you get settling, cracked concrete, and a building that shifts over time. The topsoil has to come off first. It goes somewhere — either hauled away or stockpiled on your property if you want it for landscaping later.
Step 2 — Excavation for the footer. Massachusetts has a 48-inch frost line. That means footers have to go 48 inches below the finished elevation of the slab. To figure out where that finished elevation is, you look at the driveway grade. The top of your concrete slab needs to sit a few inches above the driveway so water drains away from the building, not into it. Once you know the slab height, subtract 48 inches straight down — that's how deep the footer excavation goes.
Step 3 — Footer pour. At the bottom of the excavation, you pour the footer. For a typical garage, that's an 8-inch-thick by 16-inch-wide poured concrete footer running the perimeter. This is what the walls sit on.
Step 4 — Stem wall and slab. Concrete forms go up — typically 8 inches wide, 48 inches deep — bringing the top of the stem wall about 8 inches above finished grade. Then the slab is poured inside. All told, that's three separate concrete pours on top of the excavation work: footer, wall, slab.
A clean, straightforward job on a level site follows this sequence without surprises. The problem is that sites aren't always clean and straightforward.